AIA Contract Documents/Details

Return to Catalogue

A131™/CMc-2003 (to be discontinued 5/31/10; see A134-2009)
Standard Form of Agreement Between Owner and Construction Manager where the Construction Manager is also the Constructor and where the Basis of Payment is Cost Plus a Fee and there in no Guarantee of Cost (AGC Document 566)

Synopsis
Similar to A121™CMc–1991, this CM as constructor agreement is intended for use when the owner seeks a construction manager who will take on responsibility for providing the means and methods of construction. However, in A131CMc–2003 the construction manager does not provide a Guaranteed Maximum Price (GMP). A131CMc–2003 employs the cost-plus-a-fee method, wherein the owner can monitor cost through periodic review of a control estimate that is revised as the project proceeds. The agreement divides the construction manager's services into two phases: the preconstruction phase and the construction phase, portions of which may proceed concurrently in order to fast track the process. A131CMc–2003 is coordinated for use with A201™–1997, General Conditions of the Contract for Construction, and B151™–1997, Standard Form of Agreement Between Owner and Architect.

Member Price: $ 10.00
Non Member Price: $ 12.50